top of page
Exterior view of a modern brick-built care home with large windows, patio seating areas, landscaped gardens, and well-kept lawns.

Project:

Haxby Hall Care Home

Client:

Yorkare Home

Location:

York

Project Value:

Circa £730k Electrical

Project Duration:

Early Contractor Interaction: January 2022
Practical works commencement: May 2023 to April 2024
Completion: 18.04.2024

Scope:

Haxby Hall Care Home has become part of a 16-home portfolio for Yorkare Homes, with Carbon Synergy
being the clients only preferred electrical contractor.

The care home is a 60-bedroom development with a comprehensive electrical package included fire alarm
systems, general and emergency lighting, power, lightning protection, Solar PV, EV charging points, data
infrastructure, and access control.

All system design was undertaken in-house in close collaboration with the client from the conceptual stage
through to final delivery.

Challenges:

- Coordinating complex electrical infrastructure around evolving client-led design changes.
- Balancing compliance with evolving care sector regulations while integrating low-carbon technologies.
- Delivering repeat excellence while adapting to site-specific constraints.

Key Takeaways:

Key Takeaways:
- Consistency in delivery across multiple sites built trust and ensured repeat business.
- In-house design helped align client vision with real-world constructability.
- Strong understanding of the care sector informed practical, compliant solutions.

Contact us to discuss your requirements

Follow us on LinkedIn

  • LinkedIn
Company Accreditation

info@carbonsynergy.co.uk
01482 227266 / 01482 CARBON

Holderness House, Tower House Lane, Saltend, Hull,
East Riding of Yorkshire, HU12 8EE

   Carbon Synergy Ltd.

Registered No. 6504230

VAT No. 926 9336 91

bottom of page