Project:
Haxby Hall Care Home
Client:
Yorkare Home
Location:
York
Project Value:
Circa £730k Electrical
Project Duration:
Early Contractor Interaction: January 2022
Practical works commencement: May 2023 to April 2024
Completion: 18.04.2024
Scope:
Haxby Hall Care Home has become part of a 16-home portfolio for Yorkare Homes, with Carbon Synergy
being the clients only preferred electrical contractor.
The care home is a 60-bedroom development with a comprehensive electrical package included fire alarm
systems, general and emergency lighting, power, lightning protection, Solar PV, EV charging points, data
infrastructure, and access control.
All system design was undertaken in-house in close collaboration with the client from the conceptual stage
through to final delivery.
Challenges:
- Coordinating complex electrical infrastructure around evolving client-led design changes.
- Balancing compliance with evolving care sector regulations while integrating low-carbon technologies.
- Delivering repeat excellence while adapting to site-specific constraints.
Key Takeaways:
Key Takeaways:
- Consistency in delivery across multiple sites built trust and ensured repeat business.
- In-house design helped align client vision with real-world constructability.
- Strong understanding of the care sector informed practical, compliant solutions.